Incineration Plant
We are committed to developing incinerators that do not emit CO and CO2.
[Patent obtained: January 18, 2024 (Japanese Patent Application No. 2023-090211)]
Carbon dioxide adsorption method, carbon dioxide treatment equipment, CO2 adsorption system
Instillation work overseas 2022
Patent certificate
To print, install the browser extension "Full Page Screen Capture" and print it as a PDF.
【Supported Browsers】
Google Chrome、Firefox、Microsoft Edge
We prioritize the well-being of our environment by offering large-scale incinerators designed to minimize environmental impact.
Reduction of CO and CO2
The large-scale incinerator plant we design can suppress dioxin generation by 99% by installing a special filter.
Reduction of industrial waste
The incinerators we handle do not produce any incineration ash or fly ash, and the exhaust gas generated can be used for power generation.
We plan, design, and construct waste treatment plants. We handle incineration plants (including boilers and generators for power generation), crushers, sieving machines, sorting lines, and plants for reclaimed residual soil (used products are also acceptable).
In addition, we have extensive experience in handling waste incinerators for technical factories with diverse incinerators and pollution control equipment.
We will also work with you on the procedures for permits and licenses of government offices (industrial waste procedures for disposal businesses, procedures for the City Planning Act) that accompany it.
Industrial Waste Treatment Facilities
Industrial Waste Treatment Plants
Incineration Plant, Crusher, Vibrating Sieving Machine
Various dust collectors, containers
Design and manufacture of sorting lines and compressors
Recycle all waste
When we accept waste, it is fully recycled, thus achieving true zero emissions. No incineration ash or fly ash is generated, utalizing the latest recycling technology, so there is no need for landfills. The exhaust gas is cleaned, purified, and used as fuel for power generation. The facility also acts as the final disposal destination, and we can issue D and E slips for manifest slips.
1.Crane
ビットのごみをホッパに投入
2.Garbage Hopper
ごみをごみプレスに送る
3.Compression press
廃棄物をおよそ1/5まで圧縮し
伝間効率を向上させる
4.Degassing channel
廃棄物を乾燥・熱分解する
5.High-temperature reactor
2000℃の高温下でごみをガス化・溶融
6.Homogenizing furnace
均質化炉を通った後、冷却され
上質なスラグやメタルを回収
7.Quenching tower
ガスを瞬時に急冷却
ダイオキシンを発生させない
8.Acid Cleaning Tower
9.Alkaline Cleaning Tower
重金属類や塩素分を除去
10.Desulfurization tower
硫黄分を回収
11.Wastewater treatment facilities
金属水酸化物を取り出す
12.Salt production equipment
工業塩を取り出す
13.Gas Engines
14.Gas-fired boiler
精製されたガスを燃料として発電
Recycled materials
*JFE Engineering Co.,Ltd
Stoker incinerator
Combustible waste is incinerated at 850℃~950℃.
Combustible waste put into a stoker-type incinerator becomes incineration ash in three stages: drying, combustion, and post-combustion.
*Tesco Co.,Ltd.
Water Treatment Facilities
*Tesco Co., Ltd.
Permit application/procedure
If you want to set up an industrial waste treatment facility, you must obtain a number of permits before you can start construction. We carry out all the procedures for applying for permits and licenses related to the installation of these treatment facilities. We will also apply for Article 51 related to development.
For customers new to the industry, we will support you from the establishment of a corporate company to environmental consultation, so please contact us.
Intermediate processing business license
Environmental assessment
Transshipment storage business license
Noise/vibration notification documents
Collection and transportation business license
Types of Permit Applications
-
Application for permission to install an industrial waste treatment facility
-
Application for approval of industrial waste treatment facilities (merger and division), etc. ...
Environmental Assessment
-
Noise measurement, soundproofing measures
-
Vibrating sieve machine
-
Soil Survey
-
Measures against offensive odors
-
Debris Jaw Crusher
-
Consulting on environmental and industrial waste, etc.
Construction
We also perform demolition work and assembly work for facilities when relocating a factory.
Various demolition works
Assembly work
Dust prevention work
Construction related to resale
Various heavy construction works
Soundproofing work
Water treatment construction
Contaminated soil removal work
Machine relocation work
In Jiading District (population 3.3 million) in Shanghai, China (population 30 million), we consulted on the installation and planning of a cleaning plant with a general waste incineration capacity of 1,000 tons per day through the mediation of Fudan University, a national university of China.
We consulted on a 1000 tons/day incineration plant in Shanghai.
We carry out dismantling of large-scale incinerators and cleaning plants, as well as cleaning and removal of dioxins.
In addition, we also accept procedures for abolition (labor base, government office in charge).